Fagor 8037TS service exchange for the replacement of Fagor 8025. Includes control interface cables, feedback adapter cables, TTL Singnals or SIN Signals. After receiving the Fagor 8025 we will download and back up all programs, parameters and PLC information. We will then load the new parameters, PLC information and programs in the new control. Lead time one to two weeks from rceipt of Fagor 8025T. May require sheet metal modifications if replacing other models of Fagor controls.